New 915 D2

Follow Thread

By Paul P

  • 0 Likes
  • 2 Replies
  1. Paul P

    Paul P
    winmalee, NSW

    Hi guys I ordered a new 915 D2 with a Rogue black regular flex shaft with a white golf pride tour wrap, through my pro at Oak Pointe Country club in Brighton MI. It was ordered last Tuesday, any way of knowing how long to build and ship, just a bit excited to game it and rest my 915 D3 stiff rouge shaft. Getting to old to swing the stiff shaft I think. Regards

    Paul

  2. Bomber3

    Bomber3
    Lake St Louis, MO

    Military
    Since you didn't order anything to exotic, I would think it should ship this week (ordered a D2 with Rogue Black 60R last summer and it took just over a week to get it). The only hiccup though might be Good Friday, since Titleist may have been off work that day. I think your pro gets some sort of notification when it ships (maybe a tracking number).
  3. Chuck Z

    Chuck Z
    Mt Pleasant, SC

    Military
    Normally takes about a week to ten working days from the west coast. Barry is correct that your pro will get a notification regarding it being shipped. I would check with him. I have anxiety attacks waiting on my new clubs. I have the 915D2 Rogue Black 70S and love it. Got the 9.5 and set it a 8.75. Getting ready to turn 70 and fortunate to still be able to hit stiff shafts in all my Titleist clubs. Love the Golf Pride Midsize Multicompound Grips.

Please login to post a comment.

Sign In

Haven't registered for Team Titleist yet?

Sign Up